Convenient Charging
Village at Breckenridge EV Charging
The Village at Breckenridge offers six Level 2 Electric Vehicle (EV) charging stations for the convenience of owners and guests.
Internal Garage Chargers (Owners & Guests Only)
- Four Level 2 chargers are located inside the main parking garage:
- Two in the Green Section
- Two in the Blue Section
- These chargers are exclusively for Village owners and their guests.
- Overnight charging is permitted, but please move your vehicle once it has reached your desired charge level so that others may use the stations.
External Garage Chargers (Public Use)
- Two additional Level 2 chargers are located in the external garage.
- These chargers are available to the general public.
- Users must pay both charging fees and garage parking fees while using these stations.
Connector Type
- All chargers use the J1772 connector.
- Drivers must provide their own Tesla/NACS or CCS1 adapter, if required.
Charging Speed
- These are Level 2 chargers, typically charging an EV to 80% in approximately 6–10 hours, depending on:
- Vehicle model
- Battery size
- Starting charge level
Payment and App Requirements
- All chargers operate through the Blink charging network.
- The Blink app (available on most smartphones) is required to activate a session.
- Charging rates are set by Blink, based on current electricity costs.
- Fees are collected directly by Blink, not by the Village at Breckenridge.
*Tesla Supercharger stations can be found in Silverthorne and Frisco.