Electric Vehicle Charging

Convenient Charging

Village at Breckenridge EV Charging

The Village at Breckenridge offers six Level 2 Electric Vehicle (EV) charging stations for the convenience of owners and guests.

 

Internal Garage Chargers (Owners & Guests Only)

  • Four Level 2 chargers are located inside the main parking garage:
    • Two in the Green Section
    • Two in the Blue Section
  • These chargers are exclusively for Village owners and their guests.
  • Overnight charging is permitted, but please move your vehicle once it has reached your desired charge level so that others may use the stations.
A

External Garage Chargers (Public Use)

  • Two additional Level 2 chargers are located in the external garage.
  • These chargers are available to the general public.
  • Users must pay both charging fees and garage parking fees while using these stations.

 

Connector Type

  • All chargers use the J1772 connector.
  • Drivers must provide their own Tesla/NACS or CCS1 adapter, if required.

 

Charging Speed

  • These are Level 2 chargers, typically charging an EV to 80% in approximately 6–10 hours, depending on:
    • Vehicle model
    • Battery size
    • Starting charge level

 

Payment and App Requirements

  • All chargers operate through the Blink charging network.
  • The Blink app (available on most smartphones) is required to activate a session.
  • Charging rates are set by Blink, based on current electricity costs.
  • Fees are collected directly by Blink, not by the Village at Breckenridge.

 

*Tesla Supercharger stations can be found in Silverthorne and Frisco.